DDCX

For controls contractors

Commissioning, from points list to closeout.

Import the job's devices and I/O, let techs test points on their phones, and hand the customer a report that shows exactly what is done and what is left on every device.

AHU-2 · East Wing 72% complete · 18 of 25 points
PointNameSignalStatus
UI-01Supply Air Temp10K Type IIPass
UI-02Return Air Temp10K Type IIPass
UI-05Duct Static4-20 mAFail
UO-01Cooling Valve0-10 VDCPass
EXP1-UO-02OA Damper0-10 VDCNot tested
UI-05 failed: sensor not installed. Left: 7 points, functional test, trending.

Illustration of a device in DDCX

How a job runs in DDCX

The same four steps your team already follows, with one record of the job instead of a spreadsheet per tech.

  1. Import the points list

    Fill in one Excel workbook with the job's devices, I/O and terminal units, grouped by building. Re-import it as the job changes; DDCX shows every change before anything is written.

  2. Test in the field

    Techs mark each point pass or fail on a phone, with a failure reason, photos and VAV checkout readings. Everyone sees the same job live.

  3. Functional tests and integration

    Group identical units and test a sample, record sequence steps, and track points integrated, trending, alarming and graphics for each device.

  4. Close out

    Print a commissioning report and an incomplete report that list every open point, test step and punch item, by building or for the whole job.

What the project manager sees

Progress is calculated the same way on every screen and every report, so the number on the dashboard matches the number in the PDF.

Percent complete per device

I/O, VAV checkout, functional test and integration each count toward one figure, plus closeout items for the job.

What's left

A list of every device still open, failures first, so the next site visit has a plan.

Schedule status

On track, behind or overdue, based on time used against work done.

Buildings and phases

Run several buildings under one job number, with a percentage and a report for each.

Controller programs

Upload program versions and see which devices have the newest one loaded.

Punch list

Track deficiencies to resolution, or import them from the engineer's PDF.

Built inside a working controls company

DDCX was written by a working controls technician, for controls crews, and it is in daily use on live projects. Point addresses like EXP1-UO-02, 10K thermistors, BACnet and Niagara networks, and terminal unit balancing are part of the product because they are part of the work.

We are taking on a small number of controls contractors during the beta and set each one up personally.

See it on one of your jobs

Send us a points list and we will walk through it in DDCX with you in about 30 minutes.

hello@ddcxpro.com